Our Projects

darlington-project

136 Darlington

This project consisted of removal of the existing membrane system to the bare concrete. Additionally, concrete repairs to the slab and soffit were performed.

Read More
900-dynes-project

900 Dynes

This project consisted of extensive concrete repairs and well as concrete surface preparation. We also installed over 38000 square feet of heavy duty membrane.

Read More
180-maclaren-project

180 Maclaren

Division 3 7 was hired to remove the existing steel railings, while repairing the concrete slabs. All the balcony slabs were grinded and pedestrian membrane was installed on each slab.

Read More
1919 Kilborn-project

1919 Kilborn

This project consisted of removing all steel railings. We repaired the concrete slabs, installed the pedestrian membrane systems and new Greco Aluminum railings.

Read More
66 Slater-project

66 Slater

Division 37 was hired to remove the existing sealant present at all windows, vents and precast elements. One this phase was complete we installed new sealant on all applicable elements.

Read More
465 Cambridge-project

465 Cambridge

Division 37 was hired to remove the existing sealant present at all windows, vents and precast elements. One this phase was complete we installed new sealant on all applicable elements.

Read More
363 Besserer-project

363 Besserer

Lorem ipsum dolor consectetur adipiscing Fusce varius euismod lacus eget feugiat rorem ipsum dolor consectetur Fusce varius. varius euismod lacus eget feugiat rorem ipsum

Read More
215 Parkdale-project

215 Parkdale

This project consisted of the removal of the existing membrane system to the bare concrete. We then conducted concrete repairs to the suspended slab-Throughslab, top of slab and soffit.

Read More
110 Ambleside-project

110 Ambleside

This project consisted of concrete repairs to the walls and deck of the pool. Our team removed the existing pool coating and installed new cementitious waterproofing. Additionally, we installed a new epoxy pool coating- Podium.

Read More
Prince of Wales - EWS-project

Prince of Wales - EWS

This project consisted of the removal of the existing membrane system to the bare concrete. We then conducted concrete repairs to the suspended slab-Throughslab, top of slab and soffit.

Read More