Our Projects
136 Darlington
This project consisted of removal of the existing membrane system to the bare concrete. Additionally, concrete repairs to the slab and soffit were performed.
Read More180 Maclaren
Division 3 7 was hired to remove the existing steel railings, while repairing the concrete slabs. All the balcony slabs were grinded and pedestrian membrane was installed on each slab.
Read More1919 Kilborn
This project consisted of removing all steel railings. We repaired the concrete slabs, installed the pedestrian membrane systems and new Greco Aluminum railings.
Read More465 Cambridge
Division 37 was hired to remove the existing sealant present at all windows, vents and precast elements. One this phase was complete we installed new sealant on all applicable elements.
Read More363 Besserer
Lorem ipsum dolor consectetur adipiscing Fusce varius euismod lacus eget feugiat rorem ipsum dolor consectetur Fusce varius. varius euismod lacus eget feugiat rorem ipsum
Read More215 Parkdale
This project consisted of the removal of the existing membrane system to the bare concrete. We then conducted concrete repairs to the suspended slab-Throughslab, top of slab and soffit.
Read More110 Ambleside
This project consisted of concrete repairs to the walls and deck of the pool. Our team removed the existing pool coating and installed new cementitious waterproofing. Additionally, we installed a new epoxy pool coating- Podium.
Read MorePrince of Wales - EWS
This project consisted of the removal of the existing membrane system to the bare concrete. We then conducted concrete repairs to the suspended slab-Throughslab, top of slab and soffit.